Reconstruction and minor widening of this heavily traveled roadway are required due to an increase in traffic volume and a deteriorated pavement condition. Hazardous standing water and icing conditions occur at various locations.
Improvements will generally include the following:
- Reconstruction of Route 187 (Feeding Hills Rd from approximately 800' east of Pontoosic Rd to the Agawam Town Line for a total distance of 0.73 miles
- Sidewalks and drainage system construction/replacement
- Proposed roadway width of 36' (12' lanes and 6' shoulders)
Route 187 Reconstruction Plan Set